Building permits without wasted steps
We review the property, prepare the required studies, collect documents and submit electronically via e-Permits. From the start we explain which permit is needed, which documents are missing and which steps must come first. Proper file preparation reduces delays, corrections and unexpected costs.
We handle
Building permits
New construction, extensions, change of use and major interventions.
Small-scale permits
Renovations, insulation, scaffolding, internal reconfigurations and maintenance works.
Revisions & updates
File updates, study changes and supplementary documents.
Trade coordination
When the permit leads to construction or renovation, we link study and delivery.
Issuance process
Property check
We review titles, drawings, planning data and existing condition.
Studies & documents
We prepare architectural, structural, MEP and technical reports where required.
e-Permits submission
We file, track the process and respond to authority comments.
Frequently asked questions
- When is a small-scale permit enough?
- For many renovation or maintenance works such as insulation, scaffolding, certain internal reconfigurations or facade works — assessed case by case.
- Can work start before the permit is issued?
- Not when a permit or approval is required. Starting without one can lead to fines and future transfer problems.