Live updates
Page updated as construction progresses — current stage: structure.
Drosopoulos Development · Under construction
Kalamaria · Agios Panteleimonas
Agios Panteleimonas, Kalamaria
Contemporary 18-apartment building in Kalamaria (Agios Panteleimonas) — 7-storey building with attic, actively under construction.
The project
Palm Tree Project is a contemporary 18-apartment building in Kalamaria (Agios Panteleimonas) — 7 floors plus attic, actively under construction.
Availability
Gross and net area per apartment · price on request.
| Code | Floor | Area | Beds | Extras | Status |
|---|---|---|---|---|---|
| 1.1 | 1st | 111.4 m², 74 m² net | 3 | P · S | Available |
| 1.2 | 1st | 52 m², 34.5 m² net | 1 | P · S | Available |
| 2.1 | 2nd | 91.5 m², 60.8 m² net | 3 | P · S | Sold |
| 2.2 | 2nd | 89 m², 59.1 m² net | 3 | P · S | Sold |
| 3.1 | 3rd floor | 91.5 m², 60.8 m² net | 3 | P · S | Sold |
| 3.2 | 3rd floor | 89 m², 59.1 m² net | 3 | P · S | Sold |
| 4.1 | 4th floor | 96.4 m², 64 m² net | 3 | P · S | Available |
| 4.2 | 4th floor | 42.1 m², 28 m² net | 1 | P · S | Reserved |
| 4.3 | 4th floor | 50.4 m², 33.5 m² net | 1 | P · S | Available |
| 5.1 | 5th floor | 96.4 m², 64 m² net | 3 | P · S | Available |
| 5.2 | 5th floor | 42.1 m², 28 m² net | 1 | P · S | Available |
| 5.3 | 5th floor | 50.4 m², 33.5 m² net | 1 | P · S | Available |
| 6.1 | 6th floor | 96.4 m², 64 m² net | 3 | P · S | Available |
| 6.2 | 6th floor | 42.1 m², 28 m² net | 1 | P · S | Reserved |
| 6.3 | 6th floor | 50.4 m², 33.5 m² net | 1 | P · S | Available |
| 7.1 | 7th floor | 152.8 m², 101.5 m² net | 3 | P · S | Available |
| 7.2 | 7th floor | 42.1 m², 28 m² net | 1 | P · S | Reserved |
| 7.3 | 7th floor | 50.4 m², 33.5 m² net | 1 | P · S | Available |
Apartment block · 18 units
18 apartments (42–153 m² gross), generous balconies, pilotis parking with EV and OTIS MRL elevator — architecture by T62.
Views
Floor layout
Roof plan and slab layout per study.
1st–7th floor plans — 1–3 bedroom apartments with balconies and dual aspect.
Entrance, day areas and outdoor connection.
Storage, parking and utility rooms.
Floor plans
Select a plan to zoom in.
Specifications
Materials and systems per the project specification guide.
Underfloor heating with heat pump option. Cooling pre-wiring in every room.
Thermal-break aluminium, double/triple glazing, insect screens and electric shutters.
Arredo3 kitchen, Santa Lucia wardrobes, Marazzi first-grade tiles, fully fitted bathrooms.
OTIS MRL elevator (600 kg) with accessibility. Armoured entrance door, alarm pre-wiring.
Construction progress
Current stage: Structure · estimated delivery Q4 2028
Trust
Page updated as construction progresses — current stage: structure.
Material choices (kitchen, wardrobes, floors, colours, HVAC) at early stage.
The above is for information only and does not constitute contractual terms. Request full details before any commitment.
Location
In Agios Panteleimonas, Kalamaria — schools, retail and transport links to central Thessaloniki.
Construction
Q&A
Short answers before you request information or a visit.