Renovation without a plan ends in delays and cost overruns. With the right sequence, everything flows smoothly. Here are the stages.
1. Visit and survey
We record the existing condition, hear your needs and identify hidden issues (moisture, old installations).
2. Quote and schedule
You receive an itemised quote by task and a realistic timeline — no hidden costs.
3. Strip-out
Removal of old materials and preparation of spaces.
4. Plumbing & electrical
The "invisible" work that determines quality. Done before finishes.
5. Windows, insulation, floors
Envelope upgrade for comfort and energy savings.
6. Bathroom, kitchen, finishes
Elements that define the final look and added value.
7. Handover
Quality check, cleaning and handover with warranties.
The most common mistake? Starting finishes before plumbing/electrical are properly complete.
See: /ypiresies/anakainisi/.